Category: RokStories

Commercial, Bank of America

Beacon Portfolio

Bank of America Building,
222 2nd Ave South
Nashville, TN

Date: January 2017 – Present

Owner: Hines Development

Contract: $1.2M

Systems: CCTV, Access Control, Structured Cabling, Fire Alarm, AV

Beacon Technologies was selected by the building construction team for the installation and integration of the CCTV System, as well as the Structured Cabling, Access Control, Fire Alarm and AV systems. Beacon Technologies also participated in the initial design and budgeting process during the Design/Planning phase of the project. Comprised of 25 stories of commercial office space, Beacon provided one of Nashville’s newest premier office buildings their entire technology package with Security leading the way.

In addition to 222’s core building design and system installation, Beacon has been selected as the Low Voltage provider on a majority of the tenant build-outs over the last 12 months and continues to provide Security and technology solutions today, most recently completing the build-out on the ground floor of 222 –  Nashville’s newest restaurant The Green Pheasant, where Beacon designed and installed their CCTV, Cabling, Fire Alarm and AV systems.

Healthcare, Tri-Star Centennial

 

TriStar – Centennial Medical Center – Nashville, TN

Date: 2016—present

Owner: HCA Healthcare

Contract: $550,000

Systems: Hospital and Women’s Care – Life Safety

Beacon was selected to assist with the design of the Fire Alarm system and be solely responsible for it’s installation and commissioning in this large scale hospital addition and renovation. Beacon continues to work in this facility as the Fire Alarm installation contractor as the multi-phase construction of this hospital continues.

Commercial, Country Music Hall of Fame

Country Music Hall of Fame – Nashville, TN

Date: November 2013

Owner: Nashville

Contract: $735k

Systems: Cabling and Security

Beacon was proud to have been asked to design the complete renovation of the Country Music Hall of Fame’s distributed CCTV system and security control center.

Commercial, Four Seasons

 

 

 

 

 

Four Seasons, Nashville, TN

Date: January 2019 – 2022

Owner: The Congress Group

Contract: $3.1M

Systems: Structured Cabling, CCTV, Fire Alarm, First Responder Radio

 

Beacon has worked on the design team over the last 2 years for this ongoing construction project in the heart of downtown Nashville. In addition to assisting with the design of the leading edge GPON type Structured Cabling system, the CCTV and Fire Alarm and AV systems, Beacon will be performing the installation of all of the low voltage systems in this premier development.

The 4 Seasons project is scheduled to open in early 2022.

 

 

 

 

Commercial, Dream Hotel

Dream Hotel Printer’s Alley, Nashville Tennessee

Date: August 2017– November 2018

Owner: Dream Hotel / Royal Investments

Contract: $ 115k

Systems: Structured Cabling, CCTV

 

Beacon Technologies participated in the design, budgeting and installation process for the Dream Hotel – Printer’s Alley. Dream’s construction took place in the heart of Nashville’s historic Printer’s Alley, and security was on the forefront of the owner’s minds when they enlisted Beacon’s help for this project. Beacon is responsible for installing all of the security in this hotel including the latest in security integration with their CCTV and Access Control systems.