Commercial, Four Seasons
30 June 2020
Last Updated on 30 June 2020
0 Comments
Date: January 2019 – 2022
Owner: The Congress Group
Contract: $3.1M
Systems: Structured Cabling, CCTV, Fire Alarm, First Responder Radio
Beacon has worked on the design team over the last 2 years for this ongoing construction project in the heart of downtown Nashville. In addition to assisting with the design of the leading edge GPON type Structured Cabling system, the CCTV and Fire Alarm and AV systems, Beacon will be performing the installation of all of the low voltage systems in this premier development.
The 4 Seasons project is scheduled to open in early 2022.